- Fit clutch to the flywheel
- Install fuel pump
- Install engine/transmission
- Driveshafts in
- Install gas pedal and throttle cable
- Install shifter and linkage
- Install clutch cable
- Trim brake pedal hole in floor
- Battery in
- Get it running!!!! (Balance Carbs, set timing)
- Finish Amp/Sub wiring
- Install rear bumper
- Install washer pump and wire
- Cut hole for front dome light to size
- One more coat of under coat
- Fix the rear cabinet latch
Can do after first camp-out
- Lid for buddy seat and size cushion
- Stripes installed on body
- Install RV battery, converter and inverter
- Mud flaps
- Install propex furnace and propane bottle
- Install skid plate
No comments:
Post a Comment