The "To Do" List (we would really like to be camping May Long)
It would be fabulous if the weather co-operated!
- Finish engine valve train
- Finish engine wiring
- Fit clutch to the flywheel
- Install fuel tank
- Install fuel pump
- Install engine/transmission
- Driveshafts in
- Install gas pedal and throttle cable
- Install shifter and linkage
- Install clutch cable
- Battery in
- Get it running!!!! (Balance Carbs, set timing)
- Finish Amp/Sub wiring
- Paint wheels Fox Red and balance
- Replace front brake rotors and wheel bearings
- Install rear bumper
- Paint front kick pannel trim Fox Red
- Paint front steps Fox Red (over box liner) and install rubber step pads
- Install washer pump and wire
- Cut hole for front dome light to size
- One more coat of under coat
- Install skid plate
Can do after first camp-out
- Lid for buddy seat and size cushion
- Stripes installed on body
- Seat covers (when they arrive)
- Install RV battery, converter and inverter
- Mud flaps
- Install propex furnace and propane bottle
- Fabricate and install trailer hitch
|
The seat covers we ordered (getting arm rests too!) |
|
Kick pannel (needs paint) and front carpet |
|
Walk-though carpet |
|
Wipers are on! |
|
Remembering Before |
|
Just now |
No comments:
Post a Comment